The success of any construction-related project depends on the excavation work done from the beginning. As a construction manager, you need to follow some priorities to ensure that excavation is done just right. You agree that anytime you make a small mistake at the beginning, the whole project is thrown off. The excavation work is much easier when you collaborate knowledgeable and experienced team. But, is this enough to have a successful excavation? Follow the below guidelines to get it right from the beginning.
1. Must Manage soil Erosion
This is one thing most construction managers get it wrong. Since it is not a critical issue, most managers ignore it but end up messing the whole project. You need to have working stormwater management and soil erosion control. Before starting any excavation work, make sure you remove the topsoil layer and cover it with a silt fence. Failure to follow this precaution leads to soil erosion during the construction making the project more expensive.
2. Proper Management and Planning
You need to plan and lay the work plan before starting excavation work. You can do this through forecasting and determining all the work that should be done before the whole project is completed. Also, observe the critical site preparation before embarking on the project. The key preparations include filling piles, access roads for trucks, and the creation of necessary entrances before construction begins. If you underlook these preparations, you will have to deal with delays, which will raise the construction cost.
3. Should Take Care of Utility Lines
As a competitive construction manager, you need to take care of any underground utility line before starting any excavation work. If you fail to locate these lines, they will be destroyed, increasing the cost due to repair. These lines include fibre optics, gas lines, sewer lines, and water pipes. Make sure that you don’t disrupt them to avoid derailing the project.
4. Hires Construction Machines Instead of Buying
A construction project must cut off all the unnecessary expenses to make them commercial endeavours. Therefore, you need to plan on steps to take to make the work effective and do it at a low cost. One of the things you’ve to do is to hire excavations machines. Machines like posi track hire are cheap to hire compared to buying them. After starting the construction project, make sure that operations don’t go beyond the budget.
5. Take Opportunity of Weather Conditions
You will agree that good weather makes the excavation work easy and successful. Therefore, when the weather is cool, take the opportunity and maximize the operations. If you fail to optimize opportunity brought by good weather, bad weather might catch up with you and destroy all the gains made. As long as the sun is shining, construction work should be progressing. It saves both times and cuts cost.
6. Create a Flow of Communication
Every phase of construction work needs proper communication. You, therefore, need to establish an appropriate channel of communication with every official on the ground. This includes stakeholders as well as suppliers. Excellent communication makes the process to be smooth, reducing the costs of phone calls and emails.
If you wish to be a successful project manager, you need to follow the above simple steps during excavation, which aims at cutting the construction cost. These steps help you as the manager to eliminate weaknesses and, at the same time, creates a productive team. You now have all the tips to bring your skills to the next level—success as you save costs in your next excavation project.